 |
 |
 |
 |
|
|
 |
 |
Panama Project
Provisional Financial Assumptions
Based on acquisition of 10 ha subdivided into 40 lots of 2000 m2 each with three options:
a) Develop and sell
b) Home builder as general contractor with specification or model homes
c) Combination of both
Please click here for the PDF spreadsheet. 20% of the land are designated for infrastructure. The assumptions include all taxes, permits, fees, etc.
|
 |
 |
|
|
|
 |
|
|
|
 |
 |
 |
 |
|